Build Diary Video Part II - TW200 Skid Plate
Finished off the custom skid / bash plate for the TW today.
Originally I wanted to give aluminium brazing a go for the first time but the stock that I'd bought ended up being too thick. Because of this slight oversight, bending it would have given me a hernia. So I spent a while thinking about the alternatives and I came to the conclusion to make one up with some left over steel sheet.
I first mocked it up with some cardboard and then used it as a template although not 100% accurate it did give me a good base to start.
Once I'd cut and bent it to the correct shape I tacked everything into place, once I was happy with the fit I welded it all up. I then added some holes to reduce weight using a stepped drill bit.
The edges still need a clean up but will do all that before sending off to sandblasting.
Originally I wanted to give aluminium brazing a go for the first time but the stock that I'd bought ended up being too thick. Because of this slight oversight, bending it would have given me a hernia. So I spent a while thinking about the alternatives and I came to the conclusion to make one up with some left over steel sheet.
I first mocked it up with some cardboard and then used it as a template although not 100% accurate it did give me a good base to start.
Once I'd cut and bent it to the correct shape I tacked everything into place, once I was happy with the fit I welded it all up. I then added some holes to reduce weight using a stepped drill bit.
The edges still need a clean up but will do all that before sending off to sandblasting.
Comments